WSDOT (Washington State Dept. of Transportation) Pond and landscape is complete. The 17.28 million gallon capacity pond now features a pedestrian bridge built with custom-milled cedar timbers harvested from sites in Issaquah Highlands, a paved trail that  connects to the trail system, and an extension of the bike path.